
$19.95
See if it's really the one
Search with this product to compare it, find similar styles, or turn up something better before deciding.
There wasn't a lot of change to the system during 2011 other than a few station names and progress on a couple of track and structure renewal projects. The biggest change for the 2012 edition was the complete reconfiguration and resignaling at East 180th St. The Brighton line rebuild is now complete, the Gowanus Canal Culver Viaduct project continues and station renaming continues unabated. CBTC is fully operational on the L and coming soon to the 7. Rolling stock details were stable this year and for once didn't require extensive re-writes as fleets moved hither and yon
Have a question about this?
We currently ship within the US, with more countries coming soon.
Final cost and dates are confirmed at checkout.
🇺🇸 Ship from USA · On Agora since 2025
$19.95